Contract: ‘Construction of the road from ul. Załęska to ul. Lubelska along with construction of a road crossing of the River Wisłok in Rzeszów ‘Construction of Wantowy Bridge of the River Wisłok’, amount of inbuilt concrete: 12,733 m3, amount of inbuilt reinforced steel: 1,709,483 kg – Contractor: Bilfinger Infrastructure S.A.